Step 1
To apply the markings all you need is a propane torch,
a broom and a piece of chalk. However, as in the application of all materials, the surface must be as clean as possible and free of moisture, oil, dust etc.
|
|
|
|
| |
|
|
 |
Step 2
Remove the protective film and place the pieces on the road surface to obtain the required design. Try to place the sections as closely as possible but small gaps up to 5 mm are acceptable as the material will melt together during heating.
|
|
| |
|
|
 |
Step 3
Carefully heat the marking until the material starts to melt and bubble. However, continually move the torch over the marking to prevent burning, distortion or discoloration. If the application requires additional coating please note that each coat must be applied and heated separately. |
|
| |
|
|
 |
Step 4
Once correctly applied the material will be firmly attached to the road surface and will accept vehicular traffic within a few minutes.
|
|
| |
|
|
 |
Step 5
Decide how and where the symbol has to be fixed, using the chalk if required, and preheat the surface if it is damp or very cold.
|
|
|
|
Application instructions (D, UK, F, B):
|
|
|
|
|